项目所在国家 |
电站名称 |
净水头(m) |
机组容量(KW) |
额定转速(rpm) |
水机型号 |
发电机型号 |
机组数(Set) |
合同签订时间 |
尼泊尔 |
Thoppal Khola |
65 |
850 |
1000 |
HLD41-WJ-60 Francis type turbine |
SFW850-8/1180 |
2 |
2005 |
尼泊尔 |
Pheme Khola |
105 |
500 |
750 |
XJA-WJ-70 Turgo type turbine |
SFW500-8/990 |
2 |
2005 |
尼泊尔 |
Heldung Khola |
185 |
250 |
750 |
CJ22-W-55/1×7 Pelton type turbine |
SFW250-6/740 |
2 |
2005 |
尼泊尔 |
Middle Pheme |
22 |
120 |
1000 |
HL260-LJZ-35 Francis type turbine |
SFZ120-6/590 |
2 |
2007 |
尼泊尔 |
Middle Pheme |
14.14 |
150 |
1000 |
HL295-LJZ-50 Francis type turbine |
SFZ150-6/740 |
2 |
2007 |
尼泊尔 |
Gamgad Khola |
84 |
200 |
1000 |
XJA-W-42/1×11 Turgo type turbine |
SFW200-8/740 |
2 |
2007 |
尼泊尔 |
Upper Seti-II |
27 |
500 |
750 |
HLA551C-WJ-60 Francis type turbine |
SFW500-8/1180 |
2 |
2007 |
尼泊尔 |
Upper Hadi Khola |
250.5 |
500 |
750 |
CJA237-WJ-80/1X7 Pelton type turbine |
SFW500-8/990 |
2 |
2008 |
尼泊尔 |
Lower Piluwar Khola |
34 |
500 |
750 |
HLA904a-WJ-60 Francis type turbine |
SFW500-8/1180 |
2 |
2008 |
尼泊尔 |
Belkhu |
47.5 |
250 |
1000 |
HLA575C-LJZ-45 Francis type turbine |
SFZ250-6/740 |
2 |
2010 |
印度 |
Nagpur |
19.8 |
500 |
500 |
ZZ560 Kaplan type turbine |
SFZ500-12/1180 |
1 |
2010 |